Fixes are available
APAR status
Closed as program error.
Error description
The following constraint is present in Rational Software Modeler 7.5.1: UML 2.1/UML 2.1 Specification/Activities Package/Control Nodes Constraint ID: com.ibm.xtools.uml.validation.activity.simple.con trolNodeEdges. This constraint has error severity and executes in batch (on-dem and) mode. Description: The edges coming into and out of a control node must be either a ll object flows or all control flows. Also included in these other categories: UML 2.1/Model Quality Dimensions/Correctness When violated, it produces the following entry in the problems V iew: IRJA0053E Control node '?Join Node?' must not have control flows and object flows together. However this constraint is no longer part of the UML specificati on and therefore it should be removed from the product. See for reference this issue that illustrates when the constraint was r emoved from the UML specification: http://www.omg.org/issues/issue7006.txt http://www.omg.org/issues/issue6093.txt
Local fix
Problem summary
The constraint that edges coming into and out of a control node must be either all object flows does not apply for a join node.
Problem conclusion
Fixed in release RSx 753. The constraint no longer applies to join node.
Temporary fix
Comments
APAR Information
APAR number
PK82584
Reported component name
SW ARCHITECT WI
Reported component ID
5724I7001
Reported release
700
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2009-03-16
Closed date
2009-06-29
Last modified date
2009-06-29
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
SW ARCHITECT WI
Fixed component ID
5724I7001
Applicable component levels
R700 PSN
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSYKBQ","label":"Rational Software Architect Designer for WebSphere Software"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"700","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}},{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SS4JCV","label":"Rational Software Architect for WebSphere Software"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"700","Edition":"","Line of Business":{"code":"LOB15","label":"Integration"}}]
Document Information
Modified date:
29 June 2009