APAR status
Closed as program error.
Error description
When running in the EGLSDK environment, a build on ZOS which req uires a compile followed by a db2 bind (two step build) fails in the second step. The password is missing when the build request is set to the build server.
Local fix
Problem summary
the timeout for the build server call, as causing problems
Problem conclusion
Software updated. Fixtest available
Temporary fix
Comments
APAR Information
APAR number
PK81315
Reported component name
RATL BUS DEV
Reported component ID
5724S5000
Reported release
700
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2009-02-24
Closed date
2009-04-13
Last modified date
2009-04-13
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
RATL BUS DEV
Fixed component ID
5724S5000
Applicable component levels
R700 PSN
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSMQ79","label":"Rational Business Developer"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.0","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
13 April 2009