IBM Support

PI97634: STUB EXCEL TEST DATA ON LINUX IS SLOW TO ACCESS

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • A stub running on Linux can take 2 seconds to process Excel test
    data.  This results in a 2 second delay when responding to each
    received message.
    
    The problem can be seen in the Agent log as follows:
    
    [RunTests/instance2 (1)]: [24/04/2018, 11:20:57.855] [Debug]
    Instance 19: Tag read : PROJECT/ROOT_DIRECTORY
    (/var/myWorkspace/ita/7539796174161277891/engines/1/ProjectFiles
    )
    
    2 second delay
    
    [RunTests/instance2 (1)]: [24/04/2018, 11:20:59.954] [Debug]
    Instance 19: Tag read : Name ()
    
    STEPS TO REPRODUCE:
    
    1. Create a stub that performs a Test Data Lookup using Excel
    test data.
    2. Deploy to RIT-Agent with Debug logging enabled.
    3. Send a message to the stub.
    
    EXPECTED RESULTS:
    
    The stub responds in a few milliseconds
    
    ACTUAL RESULTS:
    
    The stub responds in 2 seconds.
    The RIT-Agent log shows the delay.
    
    WORKAROUND:
    
    Convert the test data to CSV and redesign the stub to use that
    file.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of Excel test data                                     *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * On some operating systems, previous releases of Integration  *
    * Tester did not correctly detect when a file used as the      *
    * source of a Test Data resource was modified. This might lead *
    * to data being refreshed unnecessarily.                       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • Fixed in 9.2.0.1
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI97634

  • Reported component name

    RATL INTEGRA TE

  • Reported component ID

    5725G79IT

  • Reported release

    910

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-05-04

  • Closed date

    2018-07-03

  • Last modified date

    2018-07-03

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    RATL INTEGRA TE

  • Fixed component ID

    5725G79IT

Applicable component levels

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSBLQQ","label":"IBM Rational Test Workbench"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"910","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
03 July 2018