Fixes are available
APAR status
Closed as fixed if next.
Error description
Rational Programming Patterns - v9.1.2 Description : When running the quality control on RPP cobol programs, the standard rule "RPP / Never override a line coming from a macro" does not deliver the same result as when ran on former Pacbase environment. Lines enriching conditions are wrongly considered as overrides. Example : - "IF" statement is in a macro structure code - "AND/OR" enrichment of condition is written in specific code in the program. This causes the software analyzer to detect a non respect of the rule.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All users of Rational Programming Patterns, module QC * **************************************************************** * PROBLEM DESCRIPTION: * * Generated Code wrongly considered as specific code. * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
Temporary fix
Comments
APAR Information
APAR number
PI70685
Reported component name
RATL PROG PATTE
Reported component ID
5725H0300
Reported release
912
Status
CLOSED FIN
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2016-10-14
Closed date
2016-11-15
Last modified date
2016-11-15
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
R850 PSY
UP
R900 PSY
UP
R901 PSY
UP
R910 PSY
UP
R911 PSY
UP
R912 PSY
UP
R950 PSY
UP
R951 PSY
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSKPEG","label":"Rational Programming Patterns"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"912","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
19 October 2021