Fixes are available
APAR status
Closed as Permanent restriction.
Error description
When event integration with releases is enabled, the event detail/edit drop-down takes a really long time to load the list of releases, if the total number of active releases is large. If there are only a few releases, the delay is almost negligible. However, with more that 50 releases, the delay between the event details appearing and the list of releases appearing becomes very noticeable and can become a hindrance in performance.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All users * **************************************************************** * PROBLEM DESCRIPTION: * * When event integration with releases is enabled, the event * * detail/edit drop-down takes a really long time to load the * * list * * of releases, if the total number of active releases is large * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
A fix is available in IBM UrbanCode Release 6.2.1
Temporary fix
Comments
APAR Information
APAR number
PI58332
Reported component name
UC RELEASE
Reported component ID
5725M5500
Reported release
612
Status
CLOSED PRS
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2016-03-01
Closed date
2016-04-07
Last modified date
2016-04-07
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SS4GCC","label":"IBM UrbanCode Release"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"6.1.2","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
15 October 2021