IBM Support

PI45648: SERVER CAN'T FIND VALID CERTIFICATE AFTER UPGRADING FROM RIT 8.6 TO 8.7

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • STEPS TO REPRODUCE:
    
    1. Configure an Identity Store in RIT 8.6 that has a certificate
    required to do a test connection to a server
    
    2. Do a test connection to the server
    
    3. Confirm the test connection works
    
    4. Upgrade RIT to 8.7
    
    5. Do a test connection to the server
    
    EXPECTED RESULTS:
    
    The test connection works because the valid certificate was
    returned
    
    
    ACTUAL RESULTS:
    
    The test connection fails because the valid certificate was not
    returned
    
    WORKAROUND:
    None
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * USERS UPGRADING FROM RIT 8.6 TO 8.7                          *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * STEPS TO REPRODUCE:                                          *
    *                                                              *
    * 1. Configure an Identity Store in RIT 8.6 that has a         *
    * certificate                                                  *
    * required to do a test connection to a server                 *
    *                                                              *
    * 2. Do a test connection to the server                        *
    *                                                              *
    * 3. Confirm the test connection works                         *
    *                                                              *
    * 4. Upgrade RIT to 8.7                                        *
    *                                                              *
    * 5. Do a test connection to the server                        *
    *                                                              *
    * EXPECTED RESULTS:                                            *
    *                                                              *
    * The test connection works because the valid certificate was  *
    * returned                                                     *
    *                                                              *
    *                                                              *
    * ACTUAL RESULTS:                                              *
    *                                                              *
    * The test connection fails because the valid certificate was  *
    * not                                                          *
    * returned                                                     *
    *                                                              *
    * WORKAROUND:                                                  *
    * None                                                         *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • A fix for this issue was provided in version 8.7.0.3 of Rational
    Integration Tester.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI45648

  • Reported component name

    RATL INTEGRA TE

  • Reported component ID

    5725G79IT

  • Reported release

    870

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2015-07-24

  • Closed date

    2015-11-18

  • Last modified date

    2015-11-18

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    RATL INTEGRA TE

  • Fixed component ID

    5725G79IT

Applicable component levels

  • R800 PSN

       UP

  • R801 PSN

       UP

  • R850 PSN

       UP

  • R851 PSN

       UP

  • R860 PSN

       UP

  • R870 PSY

       UP

  • R871 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSBLQQ","label":"Rational Test Workbench"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.7","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
17 October 2021