IBM Support

PI45537: HTML REPORT OUTPUT IN .MHT FILE FORMAT IS ATTACHED IN EMAIL BODY RATHER THAN THE HTML REPORT OUTPUT IN THE EMAIL BODY ITSELF.

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • In Event Studio , after adding an email task and sending email ,
    we get email with HTML report output in .mht file attached in
    email body rather than getting the HTML report output in the
    email body itself.
    Checked this tech note
    (http://www-01.ibm.com/support/docview.wss?uid=swg21659766) but
    these settings cannot be seen for the Email task in Event
    Studio.
    Body box has been kept empty and the report is selected as the
    only attachment .
    APAR PM71944 was created for 10.1.1, was fixed, but it seems the
    issue has resurfaced back in the current version.
    Reproduced in 10.2.1 FP5 and 10.2.2.
    

Local fix

  • No
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Users                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See Error Description                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to IBM Cognos Business Intelligence 10.2.2 Fix Pack  *
    * 5                                                            *
    ****************************************************************
    

Problem conclusion

  • Code Fix
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI45537

  • Reported component name

    COG EVENT STUDI

  • Reported component ID

    5724W12ES

  • Reported release

    A21

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2015-07-23

  • Closed date

    2016-05-18

  • Last modified date

    2016-05-18

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    PI54888

Fix information

  • Fixed component name

    COG EVENT STUDI

  • Fixed component ID

    5724W12ES

Applicable component levels

  • RA22 PSN

       UP

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHNWQ","label":"Event Studio v11x"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A21","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
18 May 2016