IBM Support

PI22396: IBM WEBSPHERE MQ SIFT AND PASS THROUGH FAILS WITH MQPM_NEW_MESG_ID

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • If an application specifies MQPM_NEW_MESG_ID in its Put
    configuration, a new message ID is generated.
    Sift and pass through is incorrectly applying this setting to
    the new message on the divert queue which causes the message IDs
    to no longer correlate.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All users of Rational Integration Tester with MQ             *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * In version 8.6.0 of Rational Integration Tester, a problem   *
    * was introduced that meant if an application "put" a message  *
    * to an MQ queue using the MQPMO_NEW_MSG_ID option (to force a *
    * new message ID to be generated), then sift-and-pass-through  *
    * functionality would not work correctly in stubs for that     *
    * message.  The following message would be displayed in the    *
    * RIT console:                                                 *
    *                                                              *
    * [CRRIT3114E] Failed to process finishUpStub                  *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • This problem has been fixed in Rational Integration Tester
    8.6.0.1.  It only exists in the 8.6.0 version; previous versions
    are unaffected.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI22396

  • Reported component name

    RATL INTEGRA TE

  • Reported component ID

    5725G79IT

  • Reported release

    860

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2014-07-21

  • Closed date

    2014-09-01

  • Last modified date

    2014-09-01

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    RATL INTEGRA TE

  • Fixed component ID

    5725G79IT

Applicable component levels

  • R860 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSBLQQ","label":"Rational Test Workbench"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.6","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
15 October 2021