APAR status
Closed as program error.
Error description
When trying to nest two pieces from the time dimension together (such as a reporting period with a relative time category beside it) you will get the following error:??PDS-PPE-0222 Problem in the definition of the time dimension in the Time-Based partitioned cube??If you bring in the time dimension on its own (not nested) it works without errors
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All Users * **************************************************************** * PROBLEM DESCRIPTION: * * See error description. * **************************************************************** * RECOMMENDATION: * * Upgrade to IBM Cognos Business Intelligence 10.2.0 Fix Pack * * 4 or upgrade to IBM Cognos Business Intelligence 10.2.1 Fix * * Pack 5 * ****************************************************************
Problem conclusion
Code Fix
Temporary fix
Comments
APAR Information
APAR number
PI21993
Reported component name
COG ANALYSIS ST
Reported component ID
5724W12AS
Reported release
A11
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-07-14
Closed date
2014-10-14
Last modified date
2014-11-10
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
COG ANALYSIS ST
Fixed component ID
5724W12AS
Applicable component levels
RA20 PSN
UP
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSEP7J","label":"Cognos Business Intelligence"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A11","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
06 March 2023