Fixes are available
Rational Synergy Fix Pack 3 (7.2.1.3) for 7.2.1
Rational Synergy Interim Fix 1 for 7.2.1.3
Rational Synergy Interim Fix 2 for 7.2.1.3
Rational Synergy Fix Pack 4 (7.2.1.4) for 7.2.1
Rational Synergy Interim Fix 1 for 7.2.1.4
Rational Synergy Fix Pack 5 (7.2.1.5) for 7.2.1
Rational Synergy Interim Fix 1 for 7.2.1.5
Rational Synergy Interim Fix 2 for 7.2.1.5
Rational Synergy Interim Fix 3 for 7.2.1.5
Rational Synergy Interim Fix 4 for 7.2.1.5
Rational Synergy Interim Fix 5 for 7.2.1.5
Rational Synergy Fix Pack 6 (7.2.1.6) for 7.2.1
Rational Synergy Interim Fix 1 for 7.2.1.6
Rational Synergy Fix Pack 7 (7.2.1.7) for 7.2.1
APAR status
Closed as program error.
Error description
Abstract: Adding Additional Patterns for the Sync Work Area operation using double backslash to separate directories results in the specified files not being ignored. Error Description: Steps to reproduce: 1. In Synergy GUI ? Tools ? Options ? Actions ? Sync Work Area add an Additional Pattern such as: C:\\ccm_wa\\mydb\\myproj-me\\myproj\\tempfiles\\* 2. Open a project using above work area path with new files under the specified work area path. 3. Right-click the project and select Sync Work Area ? Members and Subprojects Expected result: All files in the tempfiles directory are being ignore during a work area sync. Actual result: Files in the tempfiles directory are not being ignored during a work area sync. Local Fix: Format any Additional Pattern with single backslash only as in: C:\ccm_wa\mydb\myproj-me\myproj\tempfiles\*
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * Users using user specific custom mapping rules * **************************************************************** * PROBLEM DESCRIPTION: * * Adding Additional Patterns for the Sync Work Area operation * * using double backslash to separate directories results in * * the specified files not being ignored. * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
Fixed in Rational Synergy 7.2.1.3.
Temporary fix
Comments
APAR Information
APAR number
PI21382
Reported component name
TLOGIC SYNERGY
Reported component ID
5724V66SN
Reported release
721
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-07-04
Closed date
2015-09-30
Last modified date
2015-09-30
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TLOGIC SYNERGY
Fixed component ID
5724V66SN
Applicable component levels
R721 PSY
UP
Document Information
Modified date:
17 October 2021