IBM Support

PI12572: EGL debugger delay to reach breakpoint with EGLAR files

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Environment: Windows
    Product name: IBM Rational Business Developer
    
    Program Version    :  9.0.1
    Description.
    A performance issue is observed when using the EGL debugger
    associated with EGLAR files.
    
    This concerns the initial implementation of the EGL debugger
    only, where the startup time to actually reach the first
    breakpoint can vary between 20 to 30 seconds for some users.
    
    The example scenario is with an EGL program which contains a
    reference to an EGLAR file.
    A breakpoint is added to the first line of the main function.
    Select Debug As -? EGL Program and the debugger process can take
    from 20 up to 30 seconds to reach this breakpoint, while
    stepping through subsequent breakpoints is nearly instantaneous.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    The previous design was to resolve all dependence part,which
    is very time consume, we used on demand way to do this.
    

Problem conclusion

  • The previous design was to resolve all dependence part,which
    is very time consume, we used on demand way to do this.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI12572

  • Reported component name

    RATL BUS DEV

  • Reported component ID

    5724S5000

  • Reported release

    901

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2014-02-26

  • Closed date

    2015-03-23

  • Last modified date

    2015-03-23

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    RATL BUS DEV

  • Fixed component ID

    5724S5000

Applicable component levels

  • R901 PSN

       UP

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSMQ79","label":"Rational Business Developer"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9.0.1","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]

Document Information

Modified date:
15 October 2021