APAR status
Closed as program error.
Error description
When we try to run a drill (UP/)Down with workspace tools , Drill Down on Cognos Viewer = 7 seconds same Drill Down on Cognos Workspace = 1 minute an 30 seconds
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * **************************************************************** * PROBLEM DESCRIPTION: * **************************************************************** * RECOMMENDATION: * * Upgrade to IBM Cognos Business Intelligence 10.2.1 Fix Pack * * 3 or Upgrade to IBM Cognos Business Intelligence 10.2 * * Refresh Pack 2 * ****************************************************************
Problem conclusion
Temporary fix
Comments
APAR Information
APAR number
PI07118
Reported component name
COG REPORT STUD
Reported component ID
5724W12RS
Reported release
A21
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-11-29
Closed date
2014-06-20
Last modified date
2014-11-26
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
COG REPORT STUD
Fixed component ID
5724W12RS
Applicable component levels
RA21 PSN
UP
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHNWW","label":"Report Authoring v11x"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A21","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
26 November 2014