Fixes are available
APAR status
Closed as fixed if next.
Error description
When using "C" operation code to fulfill a date in a report, the date separator is wrongly set to "-" instead of "/". The printed date is then SSAA-MM-JJ instead of expected SSAAA/MM/JJ.
Local fix
Split the alimentation of date in two lines First line use "2" operation and on a continuation line use "U" operation followed by the appropriate codification of date transformation as specified in documentation.
Problem summary
**************************************************************** * USERS AFFECTED: * * Users generating programs with reports doing date conversion * **************************************************************** * PROBLEM DESCRIPTION: * * in the reports making the conversion of date with filling * * mode C, E, D or I, the separator could be bad because * * altered by an ADx micro-pattern. This is corrected * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
Temporary fix
Comments
APAR Information
APAR number
PH21503
Reported component name
RATL PROG PATTE
Reported component ID
5725H0300
Reported release
962
Status
CLOSED FIN
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2020-01-28
Closed date
2020-02-28
Last modified date
2020-02-28
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
R962 PSY
UP
R970 PSY
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSKPEG","label":"Rational Programming Patterns"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"962","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
14 October 2021