IBM Support

JR59199: YOU CAN'T CONFIGURE EMAIL NOTIFICATION TO ALLOW COMMUNICATION WITH THE MAIL SERVER VIA SSL

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • You might need the ability to add configuration to the email
    notification mechanism of IBM Business Process Manager (BPM)
    Standard to allow communication with the mail server via SSL.
    The configurations are defined in the 99Local.xml file.
    
    The keys are mail-smtp-port, ssl-protocols and use-ssl. The
    default values are
    
                <mail-smtp-port>-1</mail-smtp-port>
                <ssl-protocols>TLSv1.2</ssl-protocols>
                <use-ssl>false</use-ssl>
    
    PRODUCTS AFFECTED
    IBM BPM
    IBM BPM Express
    

Local fix

Problem summary

  • The SSL/TLS support was missing to traffic between IBM BPM
    setups in tenant environments and the platform SMTP server.
    

Problem conclusion

  • The ability to configure email notification to allow
    communication with the mail server via SSL has been added for
    future IBM BPM releases.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR59199

  • Reported component name

    BPM

  • Reported component ID

    5737A5700

  • Reported release

    860

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-03-07

  • Closed date

    2018-03-12

  • Last modified date

    2018-03-19

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM

  • Fixed component ID

    5737A5700

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFPJS","label":"IBM Business Process Manager"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.6.0.0","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
14 September 2022