Direct link to fix
APAR status
Closed as documentation error.
Error description
After upgrading IBM Integration Designer or an Integration Designer unit test environment (UTE), you might experience unexpected behavior, such as extra servers detected for the UTE, if you use the same workspace after the upgrade. This behavior is not documented in the IBM Business Process Manager (BPM) documentation. PRODUCTS AFFECTED IBM Integration Designer
Local fix
After you upgrade Integration Designer, use a new workspace.
Problem summary
No additional information is available.
Problem conclusion
The content will be updated the next time the documentation is refreshed.
Temporary fix
Comments
APAR Information
APAR number
JR58046
Reported component name
INTEGRATION DES
Reported component ID
5725C9702
Reported release
857
Status
CLOSED DOC
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-06-15
Closed date
2017-06-26
Last modified date
2017-06-26
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSTLXK","label":"IBM Integration Designer"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"857","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
26 June 2017