A fix is available
APAR status
Closed as program error.
Error description
The connection factories set for the Process Server and Performance Data Warehouse function have specific endpoints and transport chain specified to support secured communication with the buses by the Process Designer. The provider endpoint value included information for non secured access as well which is not valid. Also when a cluster was extended that supported the messaging engines for these connection factories, the new cluster member endpoint information was not added to the provider endpoint information. This fix removes the unsecured transport chain information and will correctly update the endpoint information when a cluster is extended.
Local fix
manual config
Problem summary
**************************************************************** * USERS AFFECTED: IBM Business Process Manager v7.5.1 users * * who have a Network Deployment * * configuration. * **************************************************************** * PROBLEM DESCRIPTION: When a cluster member with * * messaging engines, the inbound * * provider endpoint value is not * * updated with the correct ports. * **************************************************************** * RECOMMENDATION: Apply with JR42121. * **************************************************************** The connection factories set for the Process Server and Performance Data Warehouse function have specific endpoints and transport chain specified to support secured communication with the buses by the Process Designer. The provider endpoint value included information for non secured access as well which is not valid. Also when a cluster was extended that supported the messaging engines for these connection factories, the new cluster member endpoint informa
Problem conclusion
This fix removes the unsecured transport chain information and will correctly update the endpoint information when a cluster is extended. The interim fix is available on fix central and also in future releases.
Temporary fix
Comments
APAR Information
APAR number
JR42442
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
751
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-04-04
Closed date
2012-07-10
Last modified date
2012-07-10
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R750 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.5.1","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
12 October 2021