IBM Support

JR42317: SIMPLE PIE CHART LABELS OVERLAP

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • When using a Simple Pie Chart from the System Data Toolkit, text
    labels for the sectors of the chart can overlap. The labels
    are positioned over the sectors. When there are large number of
    sectors it is more likely that the labels will overlap. As a
    result, it is difficult to read the text labels.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:  Users of BPM Express, Standard, and         *
    *                  Advanced.                                   *
    ****************************************************************
    * PROBLEM DESCRIPTION: Labels overlap on a Simple Pie Chart    *
    *                      from the System Data Toolkit.           *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    The fix for JR42317 changed the Simple Pie Chart from the
    System Data Toolkit by moving the text labels from over the
    sectors of the pie chart to the edges of the sectors.  As a
    result, labels for the sectors will no longer overlap.
    

Problem conclusion

  • The fix for JR42317 is available on Fix Central for the
    7.5.1.0 level of IBM Business Process Manager.
    
    The JR42317 package available on Fix Central has two parts,
    one for the runtime (supporting Process Server and Process
    Center profiles) and one for Process Designer.  The file for
    the runtime has "BPM" in the name and the file for Process
    Designer has "BPMPD" in the name.  If the runtime fix is
    applied to an environment that supports Process Center, then
    the Process Designer fix (with "BPMPD" in the name) needs to
    be applied to every Process Designer that connects to that
    Process Center, otherwise there will be a version mismatch.
    
    Please note that JR42280 is a prerequisite fix for JR42317.
    
    
    Installation steps for 7.5.1.0:
    
    1.  Use Installation Manager to install JR42317 and the JR42280
    prerequisite for both Process Center / Process Server and
    Process Designer (using the separate "BPMPD" packages for
    Process Designer).
    2.  If the JR42280 prerequisite is applied concurrently to
    JR42317 via Installation Manager, then make sure to follow the
    additional application instructions included in the "Problem
    conclusion" section of the JR42280 document
    (http://www-304.ibm.com/support/docview.wss?uid=swg1JR42280).
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR42317

  • Reported component name

    BPM STANDARD

  • Reported component ID

    5725C9500

  • Reported release

    750

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2012-03-21

  • Closed date

    2012-06-15

  • Last modified date

    2012-06-15

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM STANDARD

  • Fixed component ID

    5725C9500

Applicable component levels

  • R750 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTDH","label":"IBM Business Process Manager Standard"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.5","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
12 October 2021