IBM Support

IV91484: MIGRATION MANAGER PACKAGE DISTRIBUTION FAILS FOR MORE THAN ONE TARGET

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • MIGRATION MANAGER PACKAGE DISTRIBUTION FAILS
    FOR MORE THAN ONE
    TARGET
    
    PROBLEM:When distributing a migration manager package to more
    than one
    migration target (database) simultaneously, the packages are
    shown to be sucessfully distributed. However, only one target
    receives the migration package even though both targets are
    listed as having received the distributed package.
    A second distribution to the target that did not receive the
    package succeeds even though it would fail if the package had
    actually been distributed the first time and was staged.
    STEPS TO REPRODUCE:
    Go to Maximo login as maxadmin/maxadmin
    Go to Migration Manager
    Select Manage Target
    Enter the Database information where you want to distibute the
    Migration package
    Create another one and
    Enter the 2 nd Database information where you want to distibute
    the Migration package
    Create a new package testdata type with snapshot / replace
    Select Group Application
    Change Status to APPR
    Create the Package
    Distribute to the package to the two database targerts
    The mesage says it's successfully distributed but it only
    distributed
    to once instance.
    Login to the 1st instance
    Go to Migration Manager -  Deploy Package you will see the
    package
    Login to the 2nd instance
    Go to Migration Manager -  Deploy Package you will NOT see the
    package
    for this instance.
    CURRENT ERRONEOUS RESULT: MIGRATION MANAGER PACKAGE
    DISTRIBUTION FAILS on the mustiple instance distribution
    EXPECTED RESULT: Should be deployed to all environments selected
    ENVIRONMENT (SYSTEM INFO):
    Tivoli's process automation engine 7.6.0.5-IFIX20160818-0828
    Build 20160611-0100 DB Build V7605-45 HFDB Build HF7605-03
    IBM TPAE Integration Framework 7.6.0.5 Build 20160610-2330 DB
    Build V7605-50
    IBM Maximo Asset Management Scheduler 7.6.3.0 Build
    20160611-0100 DB Build V7630-25
    IBM Maximo Spatial Asset Management 7.6.0.0-20160829-2126 Build
    20160318-0236 DB Build V7600-61 HFDB Build HF7600-11
    IBM Maximo for Utilities 7.5.0.1-20160415-1806 Build
    20120710-0136 DB
    Build V7501-14 HFDB Build HF7501-11
    IBM Maximo Asset Management Work Centers 7.6.0.0 Build
    20160610-1318 DB Build V7600-38
    IBM Maximo for Transportation 7.6.2.0 Build 20151204-0812 DB
    Build V7620-06
    IBM Maximo Asset Management 7.6.0.5 Build 20160611-0100 DB
    Build V7604-01
    

Local fix

  • No workaround
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Maximo Users                                             *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * MIGRATION MANAGER PACKAGE DISTRIBUTION FAILS FOR MORE THAN   *
    * ONE TARGET                                                   *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to latest release                                    *
    ****************************************************************
    

Problem conclusion

  • MIGRATION MANAGER PACKAGE DISTRIBUTION WORKS FOR MORE THAN ONE
    TARGET
    
    The fix for this APAR is contained in the following maintenance
    package:
    	 | release\fix pack | Fix Pack Release 7.6.0.8
    

Temporary fix

Comments

APAR Information

  • APAR number

    IV91484

  • Reported component name

    MIGRATION MANAG

  • Reported component ID

    5724R46MI

  • Reported release

    760

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2016-12-12

  • Closed date

    2017-03-16

  • Last modified date

    2017-03-16

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MIGRATION MANAG

  • Fixed component ID

    5724R46MI

Applicable component levels

  • R760 PSY

       UP

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCLJ96","label":"Migration Manager"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"760","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
16 March 2017