IBM Support

IV81799: WHEN RUNNING AN ACTION FROM A CHANGE TASK, THE ACTION IS RUN TWICE.

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • STEPS TO REPRODUCE:
    1. In Job Plans bring up INS12100
    2. From Flow Action Field>Go to Actions and create an App
    Action for
    WOACTIVITY object. Pick createSR and save. Return with value
    3. Check the Flow control field and save  .
    4. Open Wotrack and create new WO
    5. Add Job Plan INS12100 save
    6. Change status to INPRG
    You see it creates 2 SR which is wrong.
    
    Client is running 7.6.0.1. but also replicated in 7.6.0.3.
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Maximo Users                                             *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * When running an action from a change task, the action is run *
    * twice.                                                       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to latest release                                    *
    ****************************************************************
    STEPS TO REPRODUCE:
    1. In Job Plans bring up INS12100
    2. From Flow Action Field>Go to Actions and create an App Action
    for WOACTIVITY object. Pick createSR and save. Return with value
    3. Check the Flow control field and save  .
    4. Open Wotrack and create new WO
    5. Add Job Plan INS12100 save
    6. Change status to INPRG
    You see it creates 2 SR which is wrong.
    

Problem conclusion

  • When running an action from a change task, the action is run
    once.
    
    The fix for this APAR is contained in the following maintenance
    package:
    	 | release\fix pack | Fix Pack Release 7.6.0.8 TPAE
    

Temporary fix

Comments

APAR Information

  • APAR number

    IV81799

  • Reported component name

    ADMINISTRATION

  • Reported component ID

    5724R46A1

  • Reported release

    760

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2016-02-24

  • Closed date

    2016-12-08

  • Last modified date

    2016-12-08

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    ADMINISTRATION

  • Fixed component ID

    5724R46A1

Applicable component levels

  • R760 PSY

       UP

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHPP5","label":"System Related"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"760","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
08 December 2016