IBM Support

IV61089: INSTALL FAILS AT STARTWAS STEP

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Due to possible hardware limitations, it has been seen that on
    some servers the install of Impact 6.1.1 will fail on the
    StartWAS step of the server install.
    
    This is due to one or more of the ports the installer is waiting
    for WAS to open during server startup to never become
    available/open, resulting is a installer timeout similar to :
    
    The MachinePlan_Localhost.log shows that the error occurs right
    install step to Start WAS, ie
    IAGLOBAL_COI_STEP_StartWAS_ImpactProfile in this case :
    
    
    Caused by:
    /opt/IBM/tivoli/impact/_uninst/IMPACTInstall611/plan/install/Mac
    hinePlan
    _localhost/00001_IAGLOBAL_COI_STEP_StartWAS_ImpactProfile/IAGLOB
    AL_COI_S
    TEP_StartWAS_ImpactProfile.xml:217: condition satisfied
       at org.apache.tools.ant.taskdefs.Exit.execute(Exit.java:142)
    

Local fix

  • Please see IBM DCF on the Web for the workaround, which entails
    replacing 2 .xml files used by the Impact 6..1.1 installer
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Impact 611 Users                                         *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Due to possible hardware limitations, it has been seen that  *
    * on some servers (aix in particular), the install of Impact   *
    * 6.1.1 will fail on the StartWAS step of the server install.  *
    * This is due to one or more of the ports, the installer is    *
    * waiting for WAS to open during server startup to never       *
    * become available/open, resulting in an installer timeout.    *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * NONE                                                         *
    ****************************************************************
    

Problem conclusion

  • The proposed change is to add sleep step in the StartWAS.xml,
    StopWAS.xml, StartWAS_impact.xml and StopWAS_impact.xml files
    before and after starting the WAS server.
    A technote will be opened. The logic will be added to the
    installer code in the next release.
    The fix for this APAR is contained in the following maintenance
    package:
    | Fix pack | 6.1.1-TIV-NCI-FP0002
    

Temporary fix

Comments

APAR Information

  • APAR number

    IV61089

  • Reported component name

    NETCOOL/IMPACT

  • Reported component ID

    5724O59IS

  • Reported release

    611

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2014-05-30

  • Closed date

    2014-09-18

  • Last modified date

    2014-09-18

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    NETCOOL/IMPACT

  • Fixed component ID

    5724O59IS

Applicable component levels

  • R611 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSCP78Y","label":"Netcool\/Impact"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"611","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
18 September 2014