Error description

  • When a user attempts to display a Historical Baseline in a TEP
    chart, the displayed data does not match the selected date.
    
    Steps to reproduce:
    1.  Select a few days worth of historical data in the TEP
    client. It is important to not use today's date.  Choose
    yesterday or a day before.
    2.  Add a Historical Baseline.
    3.  Mouse-over the data for the Historical Baseline and notice
    that it isn't the date from Step 2.
    
    Problem has been observed in 622 and 623 releases.
    

Local fix

Problem summary

  • Data for the wrong date is shown if a historical baseline is set
    for a plot chart with a historical timespan ending prior to the
    current day.
    
    
    If a plot chart is configured for a timespan ending prior to the
    current day and a historical baseline is set for a specific or
    relative date, the baseline data for a different date will be
    shown. The date in the flyover for the baseline points correctly
    shows the date of the data. The date in the legend matches the
    date requested but does not match the data shown.
    Although it is not a change in behavior resulting from the fix,
    please note that the historical baseline date must be before the
    chart end date. If it is the same or later, no baseline will be
    drawn and an error message will appear in the log but there will
    be no on-screen message. Because of this restriction for plot
    charts ending before the current date, the historical baseline
    dialog option to show yesterday's data will never draw a
    baseline. The options to show last week's data or data for the
    last n days will not draw a baseline for any dates on or later
    than the chart end date.
    

Problem conclusion

  • The logic was changed to correctly calculate the date for the
    historical baseline regardless of whether or not the chart end
    date matches the current date.
    
    The fix for this APAR is contained in the following maintenance
    packages:
      | fix pack | 6.2.2-TIV-ITM-FP0009
      | fix pack | 6.2.3-TIV-ITM-FP0002
    

Temporary fix

  • Do not set a historical baseline for a plot chart unless its
    timespan ends on the current date.
    

Comments

APAR Information

  • APAR number

    IV12694

  • Reported component name

    TEP

  • Reported component ID

    5724C04EP

  • Reported release

    622

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2012-01-04

  • Closed date

    2012-04-30

  • Last modified date

    2012-06-28

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    TEP

  • Fixed component ID

    5724C04EP

Applicable component levels

  • R622 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSCTLMK","label":"ITM Tivoli Enterprise Portal V6"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"622","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
28 June 2012