A fix is available
APAR status
Closed as program error.
Error description
Total and Flashcopy capacity values in the Storage Consumption and Chargeback Reports are incorrect when a volume is a target of both a FC and GM relationship. Resulting in, the total capacity calculated in those chargeback and consumption reports double counting as the result of aggregation (sum-up) FlashCopy capacity in the total value. ________________________________________________________________ DB2 Version used for Server: 11.1.4.0 The defect is against component: 5608TPCA0 Server/Manager build/release (TPC): 5.3.2.0 Agent build/release (TPC): Server/Manager (OS): WIN Agent (OS): ________________________________________________________________ Problem as described by customer: Reports are inaccurate Initial customer impact (low/med/high): med
Local fix
TBD
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Control users creating Storage Consumption and * * Chargeback reports * **************************************************************** * PROBLEM DESCRIPTION: * * IBM Spectrum Control reports for Storage Consumption and * * Chargeback render incorrect values for Total and Flashcopy * * capacity when a volume is a target of both a FC and GM * * relationship. * * * * This results in the total capacity calculated in those * * chargeback * * and consumption reports show double counting from the * * aggregation (sum-up) of FlashCopy capacity in the total * * value. * **************************************************************** * RECOMMENDATION: * * Apply fix maintenance when available * ****************************************************************
Problem conclusion
The fix for this APAR is targeted for the following release: IBM Spectrum Control 5.3.4 [ 5.3.4-IBM-SC ] ( release target September 2019 ) http://www.ibm.com/support/docview.wss?&uid=swg21320822 The target dates for future releases do not represent a formal commitment by IBM. The dates are subject to change without notice.
Temporary fix
Comments
APAR Information
APAR number
IT29148
Reported component name
TPC ADVANCED
Reported component ID
5608TPCA0
Reported release
530
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-05-21
Closed date
2019-08-12
Last modified date
2019-08-12
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TPC ADVANCED
Fixed component ID
5608TPCA0
Applicable component levels
[{"Business Unit":{"code":"BU029","label":"Software"},"Product":{"code":"SSNECY","label":"Tivoli Storage Productivity Center Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"530"}]
Document Information
Modified date:
24 June 2022