IBM Support

IT28126: IP RECONFIGURATION FAILS TO BE APPLIED AFTER MOVING A RESTORE FROM TEST TO PRODUCTION

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • The IP reconfiguration process fails to run when moving a
    restored machine from test to production because the machine is
    powered off. After the move to production the VM may have an
    incorrect IP setting.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Spectrum Protect Plus level 10.1.0, 10.1.1, 10.1.2, and  *
    * 10.1.3                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See ERROR DESCRIPTION                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixing level when available. This problem is currently *
    * projected to be fixed IBM Spectrum Protect Plus level 10.1.3 *
    * patch 1 and 10.1.4. Note that this is subject to change at   *
    * the discretion of IBM.                                       *
    ****************************************************************
    

Problem conclusion

  • IBM Spectrum Protect Plus has been updated to correct the
    problem. When moving the virtual machine from test to
    production, the machine will be powered on to perform the IP
    reconfiguration, it will be powered off after the operation
    completes completes.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT28126

  • Reported component name

    SP PLUS

  • Reported component ID

    5737SPLUS

  • Reported release

    A13

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-02-15

  • Closed date

    2019-06-19

  • Last modified date

    2019-06-19

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • Restore
    

Fix information

  • Fixed component name

    SP PLUS

  • Fixed component ID

    5737SPLUS

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A13","Line of Business":{"code":"LOB26","label":"Storage"}}]

Document Information

Modified date:
30 January 2024