IBM Support

IT24935: INTEGRATION SERVER ABEND WHEN DEPLOYING ESQL FILE THAT CONTAINS SQL STATEMENT REFERRING FLOW/NODE PROPERTIES

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Additional Symptom(s) Search Keyword(s):
    An reference of flow or node level property (for
    eg:MessageFlowLabel keyword), when used in an ESQL with in an
    SQL statement at schema level can cause abend in the
    Integration Server.
    The abend stack will show
    SqlExposedNameList::resolveDeferredResolves at the top of the
    abend .
    

Local fix

  • Yes
    Make a copy of the Flow or Node property in the character
    variable and use the variable in the SQL statement.
    

Problem summary

  • ****************************************************************
    USERS AFFECTED:
    All users of IBM App Connect Enterprise v11 and IBM Integration
    Bus v10.0, who use ESQL database statements at schema level .
    
    
    Platforms affected:
    z/OS, MultiPlatform
    
    ****************************************************************
    PROBLEM DESCRIPTION:
    An abend may be seen in an ESQL node when it tries to evaluate
    flow level or node level property within an SQL statement at
    schema level, example MessageFlowLabel when run as a part of a
    database select/insert/update/delete statement at schema level
    causes abend in Integration Server on deploying the same code
    second time.
    
    The abend file will show
    SqlExposedNameList::resolveDeferredResolves at the top of the
    abend  stack.
    

Problem conclusion

  • The product now correctly handles ESQL database statements which
    has references to flow or node level properties defined at
    schema level  when they are deployed second time.
    
    ---------------------------------------------------------------
    The fix is targeted for delivery in the following PTFs:
    
    Version    Maintenance Level
    v10.0      10.0.0.14
    v11.0      11.0.0.1
    
    The latest available maintenance can be obtained from:
    http://www-01.ibm.com/support/docview.wss?rs=849&uid=swg27006041
    
    If the maintenance level is not yet available,information on
    its planned availability can be found on:
    http://www-1.ibm.com/support/docview.wss?rs=849&uid=swg27006308
    ---------------------------------------------------------------
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT24935

  • Reported component name

    INTEGRATION BUS

  • Reported component ID

    5724J0540

  • Reported release

    A00

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-05-02

  • Closed date

    2018-09-19

  • Last modified date

    2018-09-19

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    INTEGRATION BUS

  • Fixed component ID

    5724J0540

Applicable component levels

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSNQK6","label":"IBM Integration Bus"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"10.0","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
19 September 2018