IBM Support

IT21666: FIRST TOOLKIT REMOTE CONNECTION FAILS WHEN USING SSL.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • The first login in attempt fails when using a SSL connection
    from the toolkit to a remote Integration Node
    which is also have user security active.
    
    A reconnection works fine after this one failure.
    
    This only applies to 10.0.0.9.
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    USERS AFFECTED:
    All Users of IBM Integration Toolkit V10 using SSL remote
    connections and user security turned on.
    
    
    Platforms affected:
    Windows on x86-64 platform, Linux on x86-64 platform
    
    ****************************************************************
    PROBLEM DESCRIPTION:
    If a user has configured the remote Integration Node to use
    security and has configured SSL,  the first
    connection to the remote Integration node fails with invalid
    credentials.
    
    The problem was introduced by APAR  IT19681 which allows a user
    to connect using TLSV1.2.
    That APAR  adjusted the TLS setting on the first connection but
    incorrectly reset the password.
    

Problem conclusion

Temporary fix

Comments

APAR Information

  • APAR number

    IT21666

  • Reported component name

    INTEGRATION BUS

  • Reported component ID

    5724J0540

  • Reported release

    A00

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2017-08-03

  • Closed date

    2017-09-11

  • Last modified date

    2017-09-11

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    INTEGRATION BUS

  • Fixed component ID

    5724J0540

Applicable component levels

  • RA00 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSNQK6","label":"IBM Integration Bus"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"10.0","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
11 September 2017