IBM Support

IT21320: MESSAGE INJECTED IN TO FLOW EXERCISER FAILS AND PUBLISH NODE NOTHIGHLIGHTED.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • When injecting a message in to the Flow Exerciser to be
    processed by a message flow that includes a Publish node, an
    error is thrown by this node because the topic is missing.
    The topic had previously been set by a Compute node.
    However, if the message is passed to the flow through an
    MQInput node then all works as expected.
    
    The issue is caused because the properties parser is overriding
    the topic value in the MQRFH2 header and as a result the Publish
    node doesn't see the topic. It is possible that the same issue
    could be seen with other properties - i.e. not just the topic
    property.
    
    A supplementary issue is that the Publish flow does not
    highlight the message path when using the Flow Exerciser
    

Local fix

  • To avoid the message injection issue, remove the empty topic
    from the injected message.
    

Problem summary

  • ****************************************************************
    USERS AFFECTED:
    All Users of IBM Integration Toolkit using the flow exerciser.
    
    
    Platforms affected:
    MultiPlatform, z/OS
    
    ****************************************************************
    PROBLEM DESCRIPTION:
    The flow exerciser does not highlight the path in the flow when
    using a Publish node.
    

Problem conclusion

Temporary fix

Comments

APAR Information

  • APAR number

    IT21320

  • Reported component name

    INTEGRATION BUS

  • Reported component ID

    5724J0540

  • Reported release

    A00

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2017-07-06

  • Closed date

    2017-11-28

  • Last modified date

    2017-11-28

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    INTEGRATION BUS

  • Fixed component ID

    5724J0540

Applicable component levels

  • RA00 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSNQK6","label":"IBM Integration Bus"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"10.0","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
28 November 2017