Fixes are available
APAR status
Closed as program error.
Error description
The automated probe schedule is set in IBM Spectrum Control Web-GUI: click Settings > Automated Probe Schedule. The probes may not start at the specified time range when the IBM Spectrum Control server is installed on a machine where the LOCALE is non-US. The Schedule Balancer determines the first and last day of the balance week based on the Locale in use on that machine (in US, the "official" week is considered Sunday - Saturday, while in most European countries, the "official" week is considered Monday - Sunday). On the other hand, the Schedule Balancer is scheduled to run weekly, at midnight (in the time zone of the server) in the Saturday-Sunday night. This is OK for the server machines with Locale for which the week is considered Sunday - Saturday (like in US), but is not working properly for the server machines with Locale for which the week is considered Monday - Sunday (like in most European countries), for which the balancer should be scheduled to run weekly, at midnight (in the time zone of the server) in the Sunday-Monday night. Affected version: Spectrum Control 5.2.13 and earlier.
Local fix
Please contact IBM support.
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Control 5.2.x users with Spectrum Control * * installed on non-US locale server * **************************************************************** * PROBLEM DESCRIPTION: * * The automated probe schedule set in IBM Spectrum Control may * * not start at the specified time range when the IBM Spectrum * * Control server is installed on a machine where the locale is * * non-US. * * * * The Schedule Balancer in IBM Spectrum Control determines the * * first and last day of the balance week based on the Locale * * in use on that machine (in US, the "official" week is * * considered Sunday - Saturday, while in most European * * countries, the "official" week is considered Monday - * * Sunday). * * * * In addition, the Schedule Balancer is scheduled to run * * weekly, at midnight (in the time zone of the server) the * * night of Saturday-Sunday. This is OK for the server machines * * with Locale for which the week is considered Sunday - * * Saturday (like in US), but is not working properly for the * * server machines with Locale for which the week is considered * * Monday - Sunday (like in most European countries), for which * * the Balancer should be scheduled to run weekly, at midnight * * (in the time zone of the server) in the Sunday-Monday night. * **************************************************************** * RECOMMENDATION: * * Apply fix maintenance when available * ****************************************************************
Problem conclusion
The fix for this APAR is targeted for the following maintenance package: | refresh pack | 5.2-TIV-TPC-RP0015 - target August 2017 Fixed in IBM Spectrum Control 5.2.15 http://www.ibm.com/support/docview.wss?&uid=swg21320822 The target dates for future refresh packs do not represent a formal commitment by IBM. The dates are subject to change without notice.
Temporary fix
Comments
APAR Information
APAR number
IT20587
Reported component name
TPC ADVANCED
Reported component ID
5608TPCA0
Reported release
52D
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-05-15
Closed date
2017-07-25
Last modified date
2017-07-25
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TPC ADVANCED
Fixed component ID
5608TPCA0
Applicable component levels
[{"Business Unit":{"code":"BU029","label":"Software"},"Product":{"code":"SSNECY","label":"Tivoli Storage Productivity Center Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"52D"}]
Document Information
Modified date:
24 June 2022