IBM Support

IT17574: SCHEDULER PROCESS HANGS WHEN IBM SPECTRUM CONTROL MANAGES THOUSANDS OF SRAS

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • After a few operations like selecting tens of SRAs and enabling,
    disabling and scheduling probes,IBM Spectrum Control becomes
    very slow and eventually hangs.
    There are no errors in logs. The WebUI firstly is slow in
    loading panels and then it gets stuck in loading.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Spectrum Control 5.2.x users may encounter hanging when  *
    * modifying multiple SRAs when there are thousands of SRAs in  *
    * Spectrum Control                                             *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * After a few operations, such as selecting tens of SRAs and   *
    * enabling, disabling or scheduling probes, IBM Spectrum       *
    * Control becomes very slow and eventually hangs.              *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fix maintenance when available                         *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR is targeted for the following maintenance
    package:
    
    | refresh pack | 5.2-TIV-TPC-RP0013 - target February  2017
    
    Fixed in IBM Spectrum Control 5.2.13
    
    http://www.ibm.com/support/docview.wss?&uid=swg21320822
    
    The target dates for future refresh packs do not represent a
    formal commitment by IBM. The dates are subject to change
    without notice.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT17574

  • Reported component name

    TPC ADVANCED

  • Reported component ID

    5608TPCA0

  • Reported release

    511

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2016-10-19

  • Closed date

    2016-12-09

  • Last modified date

    2016-12-09

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    TPC ADVANCED

  • Fixed component ID

    5608TPCA0

Applicable component levels

  • R52A PSY

       UP

  • R52B PSY

       UP

  • R52C PSY

       UP

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SS5R93","label":"IBM Spectrum Control"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"511","Edition":"","Line of Business":{"code":"LOB26","label":"Storage"}}]

Document Information

Modified date:
23 March 2022