Fixes are available
APAR status
Closed as program error.
Error description
With a large initial-connection value to DataPower mq-qm object, MQ reason code 2195 would be seen in the system log when mq-qm object is transitioning to the up state. Users might end up in the state of high CPU usage when mq-qm keeps shutting down the connection pool for failed connections and establishing new ones.
Local fix
Configure DataPower mq-qm object initial-connections setting to a lower value, new connections will be established whenever needed.
Problem summary
When creating a large number of MQ connections, mq-qm may report MQRC 2195.
Problem conclusion
Fix is available in 7.2.0.6 and 7.5.0.0 For a list of the latest fix packs available, please see: http://www-01.ibm.com/support/docview.wss?uid=swg21237631
Temporary fix
Comments
APAR Information
APAR number
IT14350
Reported component name
DATAPOWER
Reported component ID
DP1234567
Reported release
720
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2016-03-16
Closed date
2016-05-13
Last modified date
2016-05-21
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
DATAPOWER
Fixed component ID
DP1234567
Applicable component levels
R720 PSY
UP
R750 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9H2Y","label":"IBM DataPower Gateway"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.2","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
11 February 2022