IBM Support

IT12720: OLD ACTIVITIES ARE STILL BEING DISPLAYED IN THE CURRENT ACTIVITIES SECTION FOR CDSA ADAPTER

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • CDSA Adapter
    Old activities are still being displayed in the  Current
    Activities section.
    

Local fix

  • STRRTC - 482936
    EM/JMB
    Circumvention:  "None"
    

Problem summary

  • Users Affected:
    All
    
    Problem Description:
    Inbound Connect:Direct sessions post session Activity events
    that are visible via "Current Activities" in the Admin UI. When
    a remote PNODE executes more than one CD process over the same
    physical connection (connection reuse or "piggy backing"),
    these events are not removed when the session completes (i.e.
    the physical connection is closed) creating "orphan" activities
    events.  These "orphans" can only be cleared by restarting
    Sterling B2B Integrator.
    
    Platforms affected:
    All
    

Problem conclusion

  • Resolution Summary:
    The CDSA SNODE now correctly removes the session activity at
    the end of each process it receives over the same physical
    connection from a remote PNODE. A code fix has been provided.
    
    Delivered In:
    5020500_11
    5020601_2
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT12720

  • Reported component name

    STR B2B INTEGRA

  • Reported component ID

    5725D0600

  • Reported release

    524

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2015-12-10

  • Closed date

    2016-01-05

  • Last modified date

    2016-04-18

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    STR B2B INTEGRA

  • Fixed component ID

    5725D0600

Applicable component levels

  • R525 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS3JSW","label":"IBM Sterling B2B Integrator"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.2.4","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
18 April 2016