Direct links to fixes
Tivoli Storage Productivity Center Refresh Pack 4
Fix Pack 5.2.4 (November 2014) for Tivoli Storage Productivity Center
Fix Pack 5.2.4.1 (December 2014) for Tivoli Storage Productivity Center
Refresh Pack 5.2.5 (March 2015) for Tivoli Storage Productivity Center (withdrawn)
Fix Pack 5.2.5.1 (April 2015) for Tivoli Storage Productivity Center (withdrawn)
Refresh Pack 5.2.6 (June 2015) for Tivoli Storage Productivity Center
Refresh Pack 5.2.7 (August 2015) for Tivoli Storage Productivity Center
IBM Spectrum Control V5.2.8 (December 2015)
IBM Spectrum Control V5.2.9 (February 2016)
IBM Spectrum Control V5.2.10 (May 2016)
IBM Spectrum Control V5.2.10.1 (July 2016)
IBM Spectrum Control V5.2.11 (August 2016)
IBM Spectrum Control V5.2.12 (November 2016)
IBM Spectrum Control V5.2.13 (March 2017)
IBM Spectrum Control V5.2.14 (May 2017)
IBM Spectrum Control V5.2.15 (August 2017)
IBM Spectrum Control V5.2.15.2 (November 2017)
IBM Spectrum Control V5.2.16 (March 2018)
IBM Spectrum Control V5.2.17 (May 2018)
Fix Pack 5.2.7.1 (February 2016) for Tivoli Storage Productivity Center
APAR status
Closed as program error.
Error description
There are discrepancies for the storage volumes size value between different TPC Web based GUI views for agentless server. In TPC web-based GUI, go to Server Resources -> Servers -> right-click on the server then go to "View Properties" and go in Storage tab. The disk space indicated are not correct if it's compared to the sum of the volumes listed in view Server Resources -> Servers -> right-click on the server then go to "View details" (in Volumes under Related ressources/Volumes).
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * TPC 5.2.x users with agentless servers * **************************************************************** * PROBLEM DESCRIPTION: * * See ERROR DESCRIPTION. * **************************************************************** * RECOMMENDATION: * * Apply fix maintenance when available. * ****************************************************************
Problem conclusion
The fix for this APAR is targeted for the following maintenance package: | refresh pack | 5.2-TIV-TPC-RP0004 - target November 2014 http://www-01.ibm.com/support/docview.wss?&uid=swg21320822 The target dates for future refresh packs or fix packs do not represent a formal commitment by IBM. The dates are subject to change without notice.
Temporary fix
Comments
APAR Information
APAR number
IT02926
Reported component name
TPC ADVANCED
Reported component ID
5608TPCA0
Reported release
521
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-07-04
Closed date
2014-10-01
Last modified date
2014-10-01
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
DISK
Fix information
Fixed component name
TPC ADVANCED
Fixed component ID
5608TPCA0
Applicable component levels
R521 PSY
UP
R522 PSY
UP
R523 PSY
UP
Document Information
Modified date:
08 January 2022