APAR status
Closed as program error.
Error description
The DataPower FTPS front side handler may error out if the data channel tries and fails to verify the client certificate before the client has been able to send the certificate. The following error will be thrown. 522 certificate mismatch between control and data connections.
Local fix
Problem summary
When using SSL use a fixed 10 second timeout to wait for SSL negotiation to complete on the data connection.
Problem conclusion
The fix will be in 3.8.0.9 & 3.8.1.7
Temporary fix
Comments
APAR Information
APAR number
IC71988
Reported component name
DATAPWER B2B XB
Reported component ID
DP1234B2B
Reported release
373
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2010-10-19
Closed date
2010-11-29
Last modified date
2010-12-08
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
DATAPWER B2B XB
Fixed component ID
DP1234B2B
Applicable component levels
R380 PSY
UP
R381 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSQ3J2","label":"WebSphere DataPower B2B Appliance XB60"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"3.7.3","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
08 December 2010