IBM Support

IBM i 7.2 Recommended Fixes - Temporary Disk Space

Preventive Service Planning


Abstract

These recommendations are based upon your system already having installed the most current Cumulative PTF Package and HIPER PTF Group.

Content

The IBM i Global Support Center recommends installing the PTFs listed below for corrective service and preventative maintenance. If a problem persists after the recommended fixes have been installed, the support engineers can more efficiently diagnose the issue. For further information or to order these PTFs, you should follow this link:  http://www.ibm.com/support/fixcentral/


Order the following recommended fixes for V7R2M0:

Note: Click on the PTF number to view the PTF cover letter. The PTF cover letter contains a description of what the PTF resolves, information about any superseded PTFs, any special instructions that need to be performed to apply the PTF, and a link to order the fix.
Date Added Fixes Product Description
05/17/2021 MF68442 5770999 DB temporary storage growth
09/01/2021 SI75960 5770SS1 Certificate temporary storage leak
09/01/2021 SI75961 5770SS1 SSL temporary storage leak
08/02/2021 SI76875 5770SS1 Certificate temporary storage leak
03/01/2022 SI78585 5770SS1 RPGLE DATA-INTO temp storage leak

Related Information

[{"Product":{"code":"SSC5L9","label":"IBM i 7.2 Preventative Service Planning"},"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Component":"--","Platform":[{"code":"PF012","label":"IBM i"}],"Version":"7.2","Edition":"","Line of Business":{"code":"LOB57","label":"Power"}}]

Historical Number

706144404

Document Information

Modified date:
01 March 2022

UID

nas8N1021564