A fix is available
APAR status
Closed as program error.
Error description
During termination of a registered subsystem, (such as CICS) EOT may get hung waiting on a subsystem latch. If EOT is called again, the two may get hung up together due to the way the latches are handled. Hang is between the UAAB and subsystem latch. The typical scenario involves a CANCEL shortly after a CICS SHUTDOWN IMMEDIATE. The shutdown immediate generates an EOT thread, and then the later cancel also causes EOT. These two threads get hung up while processing through open ACBs. If the region has many open data sets during shutdown, the window is expanded. Symptoms are a hang in during termination of a CICS region, and the D SMS,SMSVSAM,DIAG(C) may show contention on multiple latches. Problem was introduced by serialization changes in OA37889. Please review both carefully to assess exposure before removing PTFs for OA37889. Additional keywords: UAAB IDAUAAB IDASSYS IDAVSEOS
Local fix
Avoid multiple cancels to a registered subsystem (such as CICS) Closing all open ACBs prior to CICS shutdown will also reduce the exposure. If you hit the hang, restarting SMSVSAM will free the contention. FORCE on the CICS region will also free a single region, but the hang in SMSVSAM will persist until next restart.
Problem summary
**************************************************************** * USERS AFFECTED: All VSAM RLS users who plans on shutting * * down their CICS region. * **************************************************************** * PROBLEM DESCRIPTION: While shutting down the CICS region, * * a hang might occur due to multiple tcbs * * all going through End of Task and * * competing for the same resources. * **************************************************************** * RECOMMENDATION: * **************************************************************** SMSVSAM End of Task processing might results in a hang due to multiple tcbs all ending simultaneously. The serialization of End of Task requires many resources to be obtained in a correct order. If any one of the tcb obtained one resource in an incorrect order then a hang will occur during End of Task processing.
Problem conclusion
SMSVSAM End of Task processing was modified to correct the order of the resources that needs to be obtained. KEYWORDS: RLSPSP/K
Temporary fix
********* * HIPER * AA43280 *********
Comments
×**** PE14/03/10 FIX IN ERROR. SEE APAR OA44707 FOR DESCRIPTION
APAR Information
APAR number
OA43280
Reported component name
VSAM REC LEV SH
Reported component ID
5695DF122
Reported release
D10
Status
CLOSED PER
PE
YesPE
HIPER
YesHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2013-09-06
Closed date
2014-01-30
Last modified date
2014-04-29
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UA72206 OA44397 UA72142
Modules/Macros
IDAVSEOS
Fix information
Fixed component name
VSAM REC LEV SH
Fixed component ID
5695DF122
Applicable component levels
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"D10","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
29 April 2014