IBM Support

PK73556: INSTRUCTIONS NEED TO BE REWORDED IN THE PROCESS SERVER CROSS CELL SETUP PAGE OF THE INFOCENTER.

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as documentation error.

Error description

  • Filename(s) to modify:
    
    com.ibm.wp.ent.doc/bizproc/bpi_setup_crosscell.html
    
    Section Name:
    
    Enabling process integration in a cross-cell setup
    
    Release affected :  Portal 6.1
    
    
    Text reads:
    
    2. Enable CSIv2 identity assertion.
    
    
    Text SHOULD read:
    
    2. (Required if Process server and Portal server are NOT
    sharing the same LDAP).
    
    Brief Summary of Change:
    
    Step 2 should only be performed if you are setting up an
    environment where the portal server and the process server are
    not sharing the same LDAP.  If they are then the should skip to
    step 3.
    

Local fix

Problem summary

  • Steps for setting up cross cell integration with Portal and
    Process Server are missing option step
    

Problem conclusion

  • Documentation will be corrected.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PK73556

  • Reported component name

    WEBSPHERE PORTA

  • Reported component ID

    5724E7600

  • Reported release

    610

  • Status

    CLOSED DOC

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2008-10-09

  • Closed date

    2008-10-09

  • Last modified date

    2008-11-23

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSHRKX","label":"WebSphere Portal"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"6.1","Line of Business":{"code":"LOB31","label":"WCE Watson Marketing and Commerce"}}]

Document Information

Modified date:
21 December 2021