APAR status
Closed as program error.
Error description
Threading issue in Parallel Engine message layer can cause intermittent job failures in Greenplum Connector jobs. The director logs show fatal errors as below: xfm_TableName,0: APT_PMMP::makeMessage: bad message on port (1,0) - header is {2} APT_PMMP::makeMessage: bad message on port (1,0) - header is {2} or xfm_TableName,0: Internal Error: (startOfRemainder <= currentInputPosition): processmgr/msgport.C: 1523
Local fix
Try running GreenPlum stage in sequential mode. 1. Open each GreenPlum Connector stage (including that of shared container) and in the Stage Properties, set it to execute in sequential mode. 2. GreenPlum Connector properties -> Stage tab -> Advanced tab -> Execution mode - set to Sequential 3. Compile and run the jobs.
Problem summary
THREADING ISSUE IN PARALLEL ENGINE MESSAGE LAYER CAN CAUSE INTERMITTENT JOB FAILURES IN GREENPLUM CONNECTOR JOBS.
Problem conclusion
Patches are available which fix the problem. This is an important fix for Greenplum users.
Temporary fix
Comments
APAR Information
APAR number
JR58053
Reported component name
WIS DATASTAGE
Reported component ID
5724Q36DS
Reported release
B31
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-06-16
Closed date
2017-10-23
Last modified date
2017-10-23
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
PXENGINE
Fix information
Fixed component name
WIS DATASTAGE
Fixed component ID
5724Q36DS
Applicable component levels
R912 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSVSEF","label":"IBM InfoSphere DataStage"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"11.3","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
23 October 2017