A fix is available
APAR status
Closed as program error.
Error description
DataStage administrator does not allow to copy the project roles from one project to another project check box is disabled / grayed out
Local fix
Use dsadmin command line to perform action.: dsadmin -createproject ProjectName [-location ProjectLocation] [-copyroles <sourceproject>]
Problem summary
**************************************************************** USERS AFFECTED: DataStage Admin client users where the Engine tier is installed on a non-default port. **************************************************************** PROBLEM DESCRIPTION: There are no projects shown as potential source projects for the "copy roles" function on project creation. the value tab to be incorrectly deleted and to get out of step. **************************************************************** RECOMMENDATION: Apply client fix JR54756 ****************************************************************
Problem conclusion
Fixed project retrieval and comparison to cope with non-default engine ports
Temporary fix
Apply required roles to new project using the admin client, once the project is created.
Comments
APAR Information
APAR number
JR54756
Reported component name
WIS DATASTAGE
Reported component ID
5724Q36DS
Reported release
B31
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2015-11-17
Closed date
2015-12-09
Last modified date
2015-12-09
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
WIS DATASTAGE
Fixed component ID
5724Q36DS
Applicable component levels
RB31 PSY
UP
RB50 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSVSEF","label":"InfoSphere DataStage"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"11.3","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
13 October 2021