IBM Support

JR52750: Referential Integrity analysis job status shows as Completed while prerequisite Column Analysis job is still running

 

APAR status

  • Closed as program error.

Error description

  • If a selected Foreign Key candidate requires Column Analysis
    (CA) to be run first as part of a Referential Integrity (RI)
    analysis job, the RI job will show as Completed even though the
    underlying CA job is still progress and hence the RI job does
    not actually complete successfully. An example of this is when
    evaluating a multi-column FK candidate, for which a
    multi-column virtual column will be created and a CA job will
    have to run on the multi-column virtual column before the RI
    job can complete.
    

Local fix

Problem summary

  • Referential Integrity analysis job status shows as Completed
    while prerequisite Column Analysis job is still running
    

Problem conclusion

  • users should apply 11.3.1.2 to have the fix
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR52750

  • Reported component name

    WIS INFORM ANAL

  • Reported component ID

    5724Q36IA

  • Reported release

    B30

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2015-03-05

  • Closed date

    2015-06-08

  • Last modified date

    2015-06-08

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    WIS INFORM ANAL

  • Fixed component ID

    5724Q36IA

Applicable component levels

  • R912 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud \u0026 Data Platform"},"Product":{"code":"SSZJLG","label":"InfoSphere Information Analyzer"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"B30"}]

Document Information

Modified date:
14 October 2021