APAR status
Closed as program error.
Error description
If a selected Foreign Key candidate requires Column Analysis (CA) to be run first as part of a Referential Integrity (RI) analysis job, the RI job will show as Completed even though the underlying CA job is still progress and hence the RI job does not actually complete successfully. An example of this is when evaluating a multi-column FK candidate, for which a multi-column virtual column will be created and a CA job will have to run on the multi-column virtual column before the RI job can complete.
Local fix
Problem summary
Referential Integrity analysis job status shows as Completed while prerequisite Column Analysis job is still running
Problem conclusion
users should apply 11.3.1.2 to have the fix
Temporary fix
Comments
APAR Information
APAR number
JR52750
Reported component name
WIS INFORM ANAL
Reported component ID
5724Q36IA
Reported release
B30
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2015-03-05
Closed date
2015-06-08
Last modified date
2015-06-08
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
WIS INFORM ANAL
Fixed component ID
5724Q36IA
Applicable component levels
R912 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud \u0026 Data Platform"},"Product":{"code":"SSZJLG","label":"InfoSphere Information Analyzer"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"B30"}]
Document Information
Modified date:
14 October 2021