A fix is available
APAR status
Closed as program error.
Error description
PX Bridge in Netezza Connector does not clean-up when the job aborts, which causes DataStage jobs to hang on Windows
Local fix
Problem summary
When Netezza connector on parallel canvas encounters a failure, it aborts without doing  cleanup. Netezza Connector processes exits abruptly and leaves system resource handles  uncleaned. Later jobs may not be able to start causing system 'locked up'.
Problem conclusion
We implemented a mechanism to invoke Netezza CC callback before aborting a job, where Netezza CC can cleanup its thread.
Temporary fix
Comments
APAR Information
APAR number
JR50369
Reported component name
WIS DATASTAGE
Reported component ID
5724Q36DS
Reported release
870
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2014-05-29
Closed date
2016-09-21
Last modified date
2016-09-21
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
WIS DATASTAGE
Fixed component ID
5724Q36DS
Applicable component levels
R870 PSY
UP
R910 PSY
UP
R912 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSVSEF","label":"InfoSphere DataStage"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.7","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
14 October 2021