APAR status
Closed as program error.
Error description
DETAILS: When a Datastage parallel job is run on a Windows system the NTOshWrapper process is expected to start within 10 seconds and the time is not configurable. Heavily loaded systems can fail with the error IIS-DSTAGE-RUN-E-0370 'Error setting up internal communications' when this time is exceeded. RESOLUTION: Configurability is added via the environment variable DS_OSH_WRAPPER_TIMEOUT which specifies the time in seconds to be allowed for the process to start.
Local fix
n/a
Problem summary
On Windows the server expects the osh conductor to start within 10 seconds and the time is not configurable. Heavily loaded systems fail with error IIS-DSTAGE-RUN-E-0370 'Error setting up internal communications' when the time is exceeded.
Problem conclusion
The timeout period can now be configured by means of an environment variable.
Temporary fix
Comments
APAR Information
APAR number
JR43681
Reported component name
WIS DATASTAGE
Reported component ID
5724Q36DS
Reported release
870
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-08-06
Closed date
2012-12-07
Last modified date
2012-12-07
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
WIS DATASTAGE
Fixed component ID
5724Q36DS
Applicable component levels
R850 PSY
UP
R870 PSY
UP
R910 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSVSEF","label":"IBM InfoSphere DataStage"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.7","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
07 December 2012