APAR status
Closed as program error.
Error description
Scheduled pre-rendering runs daily, and it will get rescheduled to run again after 24 hour from the current run. On the day when entering daylight saving, that day will only have 23 hour (or 25 hour when exiting daylight saving day). The fix hour (24 hour) use to reschedule cause the pre-rendering to miss the scheduled times.
Local fix
Code has been updated so that the rescheduling does not rely on fix hour. Instead it was changed to run by specifying exact date, for example 3rd of October 2010.
Problem summary
Lotus WCM 6.0 scheduled pre-rendering run on wrong times when entering/exiting daylight saving Scheduled pre-rendering runs daily, and it will get rescheduled to run again after 24 hour from the current run. On the day when entering daylight saving, that day will only have 23 hour (or 25 hour when exiting daylight saving day). The fix hour (24 hour) use to reschedule cause the pre-rendering to miss the scheduled times.
Problem conclusion
Code has been updated so that the rescheduling does not rely on fix hour. Instead it was changed to run by specifying exact date, for example 3rd of October 2010.
Temporary fix
Comments
APAR Information
APAR number
PK99244
Reported component name
LOTUS WEB CONT
Reported component ID
5724I2900
Reported release
60H
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2009-10-22
Closed date
2009-10-22
Last modified date
2009-10-22
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
LOTUS WEB CONT
Fixed component ID
5724I2900
Applicable component levels
R60H PSY
UP
[{"Business Unit":{"code":"BU051","label":"N\/A"},"Product":{"code":"SUPPORT","label":"IBM Web Content Manager"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"6.0.1.4","Line of Business":{"code":"LOB33","label":"N\/A"}}]
Document Information
Modified date:
21 December 2021